Craven Street House

#cravenstreetHouse

Historic Modernization

 
front.jpg

Original House:

Built in 1919

proposed project:

Remodel Kitchen, Living Room, Lower Level Master, and add new Powder Room to open up the lower level spaces aesthetically as well as solve functionality issues. Remodel second floor, including Master Bathroom + Closet to maximize the usable square footage and option to add future Guest Bathroom for Guest Room.

Our Role:

Measurement of Original Structure
Design of Renovation Options
Budgeting


EXISTING FIRST FLOOR

EXISTING FIRST FLOOR

ITERATION 1 - “TOUCH LIGHTLY”

ITERATION 1 - “TOUCH LIGHTLY”

ITERATION 3 - “BIG KITCHEN”

ITERATION 3 - “BIG KITCHEN”


SECOND FLOOR - MASTER ITERATION A

SECOND FLOOR - MASTER ITERATION A


SECOND FLOOR - MASTER ITERATION B

SECOND FLOOR - MASTER ITERATION B

SECOND FLOOR - MASTER ITERATION B “PHASE 2”

SECOND FLOOR - MASTER ITERATION B “PHASE 2”